{"id":149,"date":"2022-01-14T21:38:00","date_gmt":"2022-01-14T21:38:00","guid":{"rendered":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/chapter\/verify-phase\/"},"modified":"2026-03-16T13:58:14","modified_gmt":"2026-03-16T13:58:14","slug":"verify-phase","status":"publish","type":"chapter","link":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/chapter\/verify-phase\/","title":{"raw":"Verify Phase","rendered":"Verify Phase"},"content":{"raw":"During the Verify Phase, the team introduces the design of the product or process and performs the validation testing to verify that it does meet customer and performance requirements. A prototype testing plan is developed and results obtained. After the prototype is built\/assembled, the testing plan is implemented to verify the design meets customer and performance requirements developed per the plan. This phase includes development of a test plan, implementation of the test plan on a manufactured\/built\/assembled prototype, results obtained and analyzed, and may also include ECN (engineering change notice) from testing results and\/or manufacturing (build) process.\n\n&nbsp;\n\n[caption id=\"attachment_148\" align=\"alignleft\" width=\"269\"]<img class=\"wp-image-147 \" src=\"https:\/\/libraryresources.nse.org.ng\/wp-content\/uploads\/sites\/11\/2022\/01\/OIP-1-1.jpg\" alt=\"Testing of Engineering Design\" width=\"269\" height=\"184\"> Engineering design testing[\/caption]\n\n[caption id=\"attachment_148\" align=\"alignleft\" width=\"305\"]<img class=\"wp-image-148 \" src=\"https:\/\/libraryresources.nse.org.ng\/wp-content\/uploads\/sites\/11\/2026\/03\/OIP-1.jpg\" alt=\"Engineering Testing 2\" width=\"305\" height=\"183\"> Engineering Design Testing[\/caption]","rendered":"<p>During the Verify Phase, the team introduces the design of the product or process and performs the validation testing to verify that it does meet customer and performance requirements. A prototype testing plan is developed and results obtained. After the prototype is built\/assembled, the testing plan is implemented to verify the design meets customer and performance requirements developed per the plan. This phase includes development of a test plan, implementation of the test plan on a manufactured\/built\/assembled prototype, results obtained and analyzed, and may also include ECN (engineering change notice) from testing results and\/or manufacturing (build) process.<\/p>\n<p>&nbsp;<\/p>\n<figure id=\"attachment_148\" aria-describedby=\"caption-attachment-148\" style=\"width: 269px\" class=\"wp-caption alignleft\"><img decoding=\"async\" class=\"wp-image-147\" src=\"https:\/\/libraryresources.nse.org.ng\/wp-content\/uploads\/sites\/11\/2022\/01\/OIP-1-1.jpg\" alt=\"Testing of Engineering Design\" width=\"269\" height=\"184\" srcset=\"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-content\/uploads\/sites\/11\/2022\/01\/OIP-1-1.jpg 263w, https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-content\/uploads\/sites\/11\/2022\/01\/OIP-1-1-65x44.jpg 65w, https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-content\/uploads\/sites\/11\/2022\/01\/OIP-1-1-225x154.jpg 225w\" sizes=\"(max-width: 269px) 100vw, 269px\" \/><figcaption id=\"caption-attachment-148\" class=\"wp-caption-text\">Engineering design testing<\/figcaption><\/figure>\n<figure id=\"attachment_148\" aria-describedby=\"caption-attachment-148\" style=\"width: 305px\" class=\"wp-caption alignleft\"><img decoding=\"async\" class=\"wp-image-148\" src=\"https:\/\/libraryresources.nse.org.ng\/wp-content\/uploads\/sites\/11\/2026\/03\/OIP-1.jpg\" alt=\"Engineering Testing 2\" width=\"305\" height=\"183\" srcset=\"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-content\/uploads\/sites\/11\/2026\/03\/OIP-1.jpg 300w, https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-content\/uploads\/sites\/11\/2026\/03\/OIP-1-65x39.jpg 65w, https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-content\/uploads\/sites\/11\/2026\/03\/OIP-1-225x135.jpg 225w\" sizes=\"(max-width: 305px) 100vw, 305px\" \/><figcaption id=\"caption-attachment-148\" class=\"wp-caption-text\">Engineering Design Testing<\/figcaption><\/figure>\n","protected":false},"author":1,"menu_order":2,"template":"","meta":{"pb_show_title":"","pb_short_title":"","pb_subtitle":"","pb_authors":[],"pb_section_license":""},"chapter-type":[],"contributor":[],"license":[],"class_list":["post-149","chapter","type-chapter","status-publish","hentry"],"part":144,"_links":{"self":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters\/149","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters"}],"about":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/types\/chapter"}],"author":[{"embeddable":true,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters\/149\/revisions"}],"predecessor-version":[{"id":150,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters\/149\/revisions\/150"}],"part":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/parts\/144"}],"metadata":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters\/149\/metadata\/"}],"wp:attachment":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/media?parent=149"}],"wp:term":[{"taxonomy":"chapter-type","embeddable":true,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapter-type?post=149"},{"taxonomy":"contributor","embeddable":true,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/contributor?post=149"},{"taxonomy":"license","embeddable":true,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/license?post=149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}