{"id":137,"date":"2020-06-18T17:49:23","date_gmt":"2020-06-18T17:49:23","guid":{"rendered":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/chapter\/purchase-order\/"},"modified":"2026-03-16T13:58:13","modified_gmt":"2026-03-16T13:58:13","slug":"purchase-order","status":"publish","type":"chapter","link":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/chapter\/purchase-order\/","title":{"raw":"Chapter 4: BOM, Purchase Order and Part Cost","rendered":"Chapter 4: BOM, Purchase Order and Part Cost"},"content":{"raw":"The original version of this chapter contained H5P content. You may want to remove or replace this element.\n\nThe original version of this chapter contained H5P content. You may want to remove or replace this element.\n\nThe original version of this chapter contained H5P content. You may want to remove or replace this element.\n<h2 style=\"text-align: center;\"><span style=\"color: #1b3b80;\"><strong>Prototype Costing Analysis Accuracy<\/strong><\/span><\/h2>\n<strong>In order to develop an accurate parts cost for the prototype, all parts MUST be accounted for on the BOM:<\/strong>\n<ol>\n \t<li><span class=\"tight\" style=\"text-align: justify;\">Purchased Parts<\/span><\/li>\n \t<li><span class=\"tight\">Donated Parts<\/span><\/li>\n \t<li><span class=\"tight\" style=\"text-align: justify;\">Fabricated parts<\/span><\/li>\n<\/ol>\n<span style=\"color: #1b3b80;\"><b>Review CANVAS Assignments 08A and 08B to see what is needed for a Subassembly and Assembly review:<\/b><\/span>\n<ol>\n \t<li>The student design teams will have one formal in-class preliminary review prior to the final review date.<\/li>\n \t<li>However, the teams are encouraged to reach out to the Boyd Lab as much as needed to ensure the final design review is approved on the due date!<\/li>\n \t<li>Both Subassembly\u00a0and Final Prototype Designs MUST be approved on time in order for the Boyd Lab to order materials for the manufacturing\/assembly process.<\/li>\n<\/ol>","rendered":"<p>The original version of this chapter contained H5P content. You may want to remove or replace this element.<\/p>\n<p>The original version of this chapter contained H5P content. You may want to remove or replace this element.<\/p>\n<p>The original version of this chapter contained H5P content. You may want to remove or replace this element.<\/p>\n<h2 style=\"text-align: center;\"><span style=\"color: #1b3b80;\"><strong>Prototype Costing Analysis Accuracy<\/strong><\/span><\/h2>\n<p><strong>In order to develop an accurate parts cost for the prototype, all parts MUST be accounted for on the BOM:<\/strong><\/p>\n<ol>\n<li><span class=\"tight\" style=\"text-align: justify;\">Purchased Parts<\/span><\/li>\n<li><span class=\"tight\">Donated Parts<\/span><\/li>\n<li><span class=\"tight\" style=\"text-align: justify;\">Fabricated parts<\/span><\/li>\n<\/ol>\n<p><span style=\"color: #1b3b80;\"><b>Review CANVAS Assignments 08A and 08B to see what is needed for a Subassembly and Assembly review:<\/b><\/span><\/p>\n<ol>\n<li>The student design teams will have one formal in-class preliminary review prior to the final review date.<\/li>\n<li>However, the teams are encouraged to reach out to the Boyd Lab as much as needed to ensure the final design review is approved on the due date!<\/li>\n<li>Both Subassembly\u00a0and Final Prototype Designs MUST be approved on time in order for the Boyd Lab to order materials for the manufacturing\/assembly process.<\/li>\n<\/ol>\n","protected":false},"author":1,"menu_order":3,"template":"","meta":{"pb_show_title":"","pb_short_title":"","pb_subtitle":"","pb_authors":[],"pb_section_license":""},"chapter-type":[],"contributor":[],"license":[],"class_list":["post-137","chapter","type-chapter","status-publish","hentry"],"part":132,"_links":{"self":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters\/137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters"}],"about":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/types\/chapter"}],"author":[{"embeddable":true,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":1,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters\/137\/revisions"}],"predecessor-version":[{"id":138,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters\/137\/revisions\/138"}],"part":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/parts\/132"}],"metadata":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapters\/137\/metadata\/"}],"wp:attachment":[{"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/media?parent=137"}],"wp:term":[{"taxonomy":"chapter-type","embeddable":true,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/pressbooks\/v2\/chapter-type?post=137"},{"taxonomy":"contributor","embeddable":true,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/contributor?post=137"},{"taxonomy":"license","embeddable":true,"href":"https:\/\/libraryresources.nse.org.ng\/me270baughman\/wp-json\/wp\/v2\/license?post=137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}